
Mikano were able to engineer a solution that required the unit to be stick built on site due to access restrictions, the scheduled build time to completion is two weeks. Built on screw in pilings and manufactured using galvanised steel, cold-formed profiles, utilising composite panels Single ply roof. Aluminium and cedar Architectural façade system.
Source : www.Mikano.co.uk

No comments:
Post a Comment